Product Details:
Payment & Shipping Terms:
|
Mortar Sprayer Machine for Paint Spraying with Air Compressor 1.1KW
EZ-SA 1301 is a high pressure air-compressed sprayer machine. It should works with air compressor
(of 2.2KW).
High Productivity: 800-1500sqm/day
Reducing Labor Cost: saving 80%
Applied Materials: putty powder, latex paint, lacquer, water-proof materials, water-soluble materials, emboss coatings, etc.
Application: internal wall & external wall, ceiling, waterproof surface, rust-proof surface, gardening,
embossment, etc.
REMARKS:
Ratio of Water & Putty Powder = 2:1
Specifications:
Model NO. |
EZ-SA 1301 |
|||
Power |
1.KW*220V / 1.5KW*380V |
Frequency |
50 HZ |
|
Electricity Phase |
Single Phase/ Three Phase |
Net Weight |
60 KGS |
|
RPM |
600 R/Min |
Flux |
6 L/Min |
|
Equipped Standard Nozzle Diameter |
4mm, 6mm, 8mm |
Applied Max Nozzle Diameter |
8mm |
|
Aggregate Size |
≥80 Mesh (dia. less than 1MM ) |
Resistance Strength of High-Pressure Hose |
≥800 bar |
|
Length of Standard Equipped Hose |
15 m |
Spraying Thickness |
1mm-3mm |
|
Vertical Spraying* |
5 - 15 m |
Horizontal Spraying* |
20 m |
|
Tank Capacity |
25 L |
Productivity |
800-1500 sqm/day |
|
HS Code |
8424.20.0000 |
Meas. |
115*57*112 cm (0.73CBM ) |
*means the distance from machine to operator while spraying
Package of Machine:
Sprayer Machine Body |
1 PC |
Spray Gun |
1 SET |
High-Pressure Hose |
1 PC (15m) |
Standard Accessories |
1 SET |
Nozzle |
3 PCS (dia. 4mm, 6mm, 8mm) |
User Manual |
1 PC |
Advantages:
1. High productivity: 800-1500sqm/8 hours. Save 80% time & labor cost.
2. Satisfying effect: Film effect only by once spraying.
Flat, Smooth, Clear & Mirror Effect without Particles, Bubbles or Brushmark.
Horizontally plus vertically spraying will make much better finish.
3. Adjustable spraying speed & flux.
4. Easy operation & easy maintenance.
Points for operation & maintenance:
.To moist hose with water before work.
.It's forbidden to start machine without materials or water in tank.
.To clean hose, pipe & material tank with water after work.
.To add grease into machine monthly after regular cleaning.
.To change new screw pump every 3 months.
.Do not clean machine with power ON.